PT Jawa Satu Power (“JSP”), or the Jawa-1 Project, is a joint venture between Pertamina NRE (40% shares), Marubeni (40% shares), and Sojitz (20% shares). The Company was established on 5 December 2016 with the purpose of operating, controlling, and managing the assets and business activities of a gas-fueled power plant utilizing Combined Cycle Gas Turbine (CCGT) technology, the largest of its kind in Southeast Asia.